A packed day, starting with a cold (only 6 degree) SAAB run to drop it off at Abbotts for the service and MOT.
We picked up the garage lights on the way back and even made time for a de-tour via Harkstead for a job and to pick up the van. I also warmed the Talbot up to reverse it out to make space.
The afternoon was spent fitting those lights after moving the Talbot onto the drive - checking for leaks I spotted water splashed on the panel on the other side of the engine bay too, but no obvious drips.
Two and a half hours later we were all done and boy what a difference.

No comments:
Post a Comment