Bubble erected for the Riley ready for tomorrow.
It took about 2 hours with gaps but only about 10 mins to inflate and les than an hour to make the frame. I celebrated by taking the E-type out for a run and putting down the base for that bubble too.
I also stuck the SAAB badge back on and moved the Alpine windscreen to the workshop. Talking of which I got a picture from Lee - the Alpine battery cable had been rubbing on the prop shaft for some time - and had been cut through I wonder if that was me making the earth 'better' ?
Finally after the rain showers a ride in the MK7 for shopping.
No comments:
Post a Comment